( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
| 번호 | Project | Client | Period | Scope |
|---|---|---|---|---|
| 170 | LER(III) REVAMPING PROJECT | KUMHO P&B CHEM | 2020.10~2021.10 | E / P / C |
| 169 | PRODUCTION AND INSTALLATION OF 3 TYPES OF OUTDOOR TRAINING FACILITIES | NICS | 2020.05~2020.12 | E / P / C |
| 168 | LOTTE CHEM INFRA-2 FEED DESIGN | LOTTE E&C | 2020.01~2020.03 | E |
| 167 | PLANT 2 DEBOTTLENECKING PRE-ENGINEERING | KUMHO POLY CHEM | 2018.11~2019.01 | E |
| 166 | DETAIL DESIGN & APPROVAL OF BPA HEAVIES | LG CHEM | 2020.07~2020.12 | E |
| 165 | GUNSAN PLANT, RE CVD THERMAL STRESS ANALYSIS | OCI | 2020.07~2020.10 | E |
| 164 | EPC WORKS FOR VCU INSTALLATION PROJECT | S-OIL | 2020.06~2020.12 | E / P / C |
| 163 | DETAIL ENGINEERING SERVICES RELATED TO JPC-550(1,000 L/HR PROCESS UNIT) AND NEW SITE TANK INSTALLTION PROJECT | EM TECH | 2020.05~2021.06 | E |
| 162 | PLANT2 3D-SCANNING/MODELING SERVICE | GS CALTEX | 2020.05~2020.12 | E |
| 161 | KP-1 RTO-1 INSTALLATION PROJECT | KUMHO POLY CHEM | 2020.04~2021.12 | E / P / C |
| 160 | NEW INSTALLATION OF D-GE/BDG EXPANSION REACTION FACILITY FOR DAESAN PLANT | LOTTE CHEM | 2020.03~2021.03 | E / P / C |
| 159 | BASF YEOSU PLANT HCL 35% EXTERNAL NEW PIPING DESIGN & APPROVAL | HANWHA SOLUTION | 2020.03~2020.06 | E |
| 158 | BASF YEOSU PLANT HCL 35% EXTERNAL NEW PIPING DESIGN & APPROVAL | HANWHA SOLUTION | 2020.03~2020.06 | E |
| 157 | INSTALLATION OF 5 PETROCHEMICAL TANKS & DESIGN OF ADDITIONAL FACILITIES | MARINE GLORY | 2020.01~2021.12 | E |
| 156 | LG MMA M2 MTBE(METHYL TERTIARY BUTHYL ETHER) EXPANSION DESIGN | S&I CORP. | 2019.11~2020.12 | E |
| 155 | LG CHEM Y2C(YEOSU #2 COMPLEX) SAPO PIER EXTERNAL PIPING CONSTRUCTION | GS E&C | 2019.11~2020.09 | E / P / C |
| 154 | 80,000T/Y KAR(KUMHO ACETONE RECYCLE) PROJECT | KUMHO P&B CHEM | 2019.10~2021.05 | E / P / C |
| 153 | SBS(STYRENE BUTADIENE STYRENE) 45,000T REVAMPING PROJECT | KUMHO PETRO CHEM | 2019.10~2020.08 | E / P / C |
| 152 | NEW LOGISTICS BASE CONSTRUCTION | KUMHO MITSUI CHEM | 2019.10~2020.08 | E / P / C |
| 151 | PIPE RACK SAFETY DIAGNOSIS OF EXTERNAL PIPELINES BETWEEN 10-2,3 SECTIONS | YEOSU TECHNICAL DIRECTOR’S COUNCIL | 2019.10~2020.01 | E |
| 150 | DETAILED DESIGN OF VCM1 EDC(ETHYLENE DICHLORIDE) REACTION PROCESS IMPROVEMENT | LG CHEM | 2019.09~2020.07 | E |
| 149 | TANK REVAMPING PROJECT | PMC TECH | 2019.04~2020.03 | E |
| 148 | 2019 SHUTDOWN INVESTMENT CONSTRUCTION PROJECT | KUMHO MITSUI CHEM | 2019.04~2019.06 | E / P / C |
| 147 | GS CALTEX MFC PROJECT (PIPING/ELEC./INSTR./CIVIL DESIGN) | GS E&C | 2019.02~2021.04 | E |
| 146 | CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(INSIDE THE FACTORY) | GS E&C | 2019.02~2021.04 | E |
| 145 | GS CALTEX MFC OUTER PIPE LINE INSTALLATION WORK | GS E&C | 2019.02~2021.04 | E / C |
| 144 | LG MMA #3 FACTORY MAA PRODUCT TOWER REPLACEMENT AND INSTALLATION | LG MMA | 2019.02~2019.11 | E / P |
| 143 | ETHYLENE & BTX AREA ENERGY SAVING PROJECT | YNCC | 2019.01~2019.06 | E / P / C |
| 142 | CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(OUTSIDE THE FACTORY) | GS CALTEX | 2018.12~2019.06 | E |
| 141 | SIHWA GABLE-INFRASTRUCTURE EPC PROJECT | VERSUM PM KOREA | 2018.12~2019.05 | E / P / C |